新(xīn)聞中心(xin)
| 地(dì)址: | 河北(běi)省泊男人为🔞啥喜欢使劲桶女人❌頭(tou)市道東(dōng)街88号 |
| 電(diàn)話: | 0317-8185077 |
| 0317-8263980 | |
| 0317-8223128 | |
| 傳真(zhēn): | 0317-8265584 |
| E-mail: | [email protected] |
公司新(xin)聞
你所(suǒ)在位置(zhì):首頁 - - 新(xīn)聞中心(xīn) - 公司新(xīn)聞| KCB300齒輪(lun)泵流量(liàng)18m3/h做潤滑(huá)油排油(yóu)泵助力(li)四川成(cheng)達 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 發布(bù)時間:2015-4-3 9:05:28 點(dian)擊次數(shù): | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KCB300齒輪泵(beng)流量18m3/h,壓(yā)力0.36Mpa,吸入(ru)真空高(gāo)度3米,效(xiào)率42%,口徑(jìng)70,電機功(gōng)率7.5KW KCB300齒輪(lun)圖片:
KCB300整(zheng)機安裝(zhuang)尺寸圖(tú)
KCB齒輪油(yóu)泵在輸(shū)油系統(tǒng)中可用(yòng)作傳輸(shū)、增壓泵(beng);KCB gear oil pump in the oil system can be used as a transport, booster pump; 在燃油(yóu)系統中(zhōng)可用作(zuò)輸送、加(jiā)壓、噴射(shè)的燃油(you)泵;In the fuel system can be used as a transport, pressure, jet fuel pump; 在一(yi)切工業(ye)領域中(zhōng),均可作(zuò)潤滑油(yóu)泵用。In all industrial areas, can be used as lubricating oil pump. KCB齒(chi)輪泵主(zhǔ)要有齒(chǐ)輪、軸、泵(beng)體、安全(quan)閥、軸端(duan)密封所(suo)組成。齒(chi)輪經熱(re)🔆處理有(you)較高的(de)硬度和(he)強度,與(yu)軸一同(tong)安裝在(zài)可更換(huàn)的軸套(tao)☂️内運🌈轉(zhuan)。泵内全(quán)部零件(jiàn)的潤滑(huá)均在💞泵(bèng)工作📧時(shi)利用輸(shū)出介質(zhì)而自動(dòng)達到。 泵(bèng)内有設(she)計合理(lǐ)的洩油(you)和回油(yóu)槽,是齒(chi)輪在工(gong)作中✍️承(cheng)受的扭(niǔ)🈲矩力最(zuì)小,因此(cǐ)軸承負(fu)荷小,磨(mo)損小,泵(bèng)效率高(gāo)。Pump is the drainage and back into the groove of reasonable design, is a gear in the work under the minimum torque force, so the bearing load is small, wear small, pump with high efficiency. 泵設有(you)安全閥(fá)作為超(chāo)載保護(hù),安全閥(fá)的全回(huí)流壓力(li)📐為泵👄額(é)定排除(chu)壓力的(de)1.5倍,也可(ke)在允許(xu)排出壓(ya)力範圍(wéi)内根據(jù)實際需(xu)要另外(wai)調整🏃。但(dàn)注意本(ben)安全閥(fá)不能作(zuò)減壓閥(fa)的長期(qī)工作,需(xū)要時可(kě)在管路(lu)🚩上另行(háng)安裝。從(cong)主軸外(wai)伸端向(xiàng)🈲泵看,為(wéi)順時針(zhēn)旋轉。Pump is equipped with safety valve as overload protection, the total reflux pressure relief valve is rated pump out pressure of 1.5 times, also can allow discharge pressure range according to actual needs and adjust. But note that this cannot be a long-term work pressure reducing valve, relief valve can be installed in the piping shall be separately when necessary. To pump from the main shaft overhang end to see, for clockwise. KCB齒(chǐ)輪泵安(an)裝順序(xu): KCB gear pump installation order:
1、在安裝(zhuang)過程中(zhong),為防止(zhǐ)雜物落(luo)入機器(qì)内,機組(zǔ)的所有(you)孔眼均(jun)應蓋好(hǎo)。1, during the installation process, so as to prevent debris into the machine, all perforation should cover of the unit. 、校正泵(beng)軸和電(dian)機軸的(de)同心度(du),在聯軸(zhóu)大路外(wai)圓上,允(yun)許偏差(chà)0.1毫米;兩(liang)聯軸器(qi)平面的(de)間隙應(yīng)保證~4毫(háo)米,(小泵(beng)取小值(zhí))間隙要(yào)均勻,允(yǔn)差毫米(mǐ)。3, calibration of pump shaft and motor shaft concentricity, cylindrical, along the road in coupling allowable deviation of 0.1 mm;In the plane of the two coupling gap should guarantee 2 ~ 4 mm, small little pump (in value) clearance wants even, tolerance of 0.3 mm. 7、在(zài)機組實(shi)際試運(yùn)行2~3小時(shi)後,作最(zuì)後檢查(chá),如無不(bú)良現象(xiang),則認為(wéi)安裝合(he)格。 7, in the actual commissioning unit 2 ~ 3 hours later, a final inspection, if there is no negative phenomenon, is considered qualified installation.
|
傳(chuán)真:0317-8265584 E-mail:[email protected]備案(an)号:冀ICP05010751号(hao)-3

.jpg)
