新(xin)聞中心
| 地址: | 河北省泊(bo)頭市道東百炼❌成妖下载🚩街88号 |
| 電(diàn)話: | 0317-8185077 |
| 0317-8263980 | |
| 0317-8223128 | |
| 傳真: | 0317-8265584 |
| E-mail: | [email protected] |
| 齒輪箱潤滑油(you)泵采用3gr70*3w21三螺杆泵(bèng)配18.5kw-4電機 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 發布時間(jian):2015-3-5 10:15:36 點擊次數: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3GR70*3W21三螺杆(gan)泵參數表:
油品的顔色(se),往往可以反映其(qi)精制程度和穩定(dìng)性。對❌于⭐基礎❄️油來(lai)說,一般精制程度(du)越高,其烴的氧化(hua)💛物和硫化物脫除(chu)的越幹淨,顔色也(yě)就越淺。但是,即使(shǐ)精制的條件🔴相同(tóng),不同油源和基屬(shǔ)的原油所生産的(de)基礎油,其顔色和(he)透明度也可能是(shì)✍️不相同的。 對于新(xin)的成品潤滑油,由(you)于添加劑的使用(yong),顔色作為判斷基(ji)礎🌈油精制程度高(gao)低的指标已失去(qù)了它原來的意義(yi)。 密度:密度是潤滑(hua)油最簡單、最常用(yòng)的物理性能指✔️标(biao)。潤滑油的密度随(suí)其組成中含碳、氧(yǎng)、硫的數量的增加(jia)而增大,因而在同(tóng)樣粘度或同樣相(xiàng)對分子質量的情(qing)👨❤️👨況下,含芳烴多⭐的(de),含膠質和瀝青質(zhi)多的潤滑油密度(dù)👨❤️👨最大,含環烷烴多(duō)的居中,含烷烴多(duo)的最小。 粘度 粘度(du)反映油品的内摩(mo)擦力,是表示油品(pin)油性和流🔱動性的(de)🔞一項指标。在未加(jiā)任何功能添加劑(ji)的前提下,粘度越(yuè)☀️大,油膜強度越高(gāo),流動性越差。 粘度(du)指數:粘度指數表(biǎo)示油品粘度随溫(wēn)度變化的程度。粘(zhan)度指數越高,表示(shì)油品粘度受溫度(dù)的影響越小,其粘(zhān)溫性能越好,反之(zhi)越差。 用來輸送溫(wen)度≤150℃、粘度3-760cSt、不含固體(ti)顆粒、無腐蝕性、具(ju)有潤滑性能的介(jie)質。适用壓力範圍(wei):0.6-2.5Mpa;适用流量範圍:0.6-123m3/h。主(zhu)要應用于燃油輸(shu)送、液壓工程、船舶(bo)工程,石化及其他(ta)工👣業。Used to transfer temperature 150 ℃, the viscosity of 3 or less - 760 CST, not containing solid particles,non-corrosive, has the lubrication performance of the medium.Apply pressure range: 0.6 to 2.5 Mpa;Applicable flow range: 0.6-123 m3 / h.Mainly used in the fuel transfer, hydraulic engineering, Marine engineering, petrochemical and other industries. 3G型三(sān)螺杆泵是轉子型(xing)容積泵,适于輸送(song)各種不含固🧑🏽🤝🧑🏻體顆(kē)粒,無腐蝕性油類(lèi)及類似油的潤滑(huá)性液體、輸送液體(ti)💛粘度2~760mm2/s,溫度不超過(guo)80℃, 超過80℃可用高溫泵(beng)3GW型。3 g type is three screw pump rotor type positive displacement pump, is suitable for conveying various not containing solid particles, non-corrosive oil lubricity and similar oil liquid, conveying liquid viscosity was 2 to 760 / s, temperature not over 80 ℃, more than 80 ℃ high temperature pump available 3 gw type. 3G型三螺杆泵(bèng)軸伸支承較小,應(yīng)由原動機經彈性(xing)聯軸器直⁉️接驅動(dong),不得用皮帶輪等(děng)會産生額外徑向(xiang)力較大的傳動方(fang)式傳動。3 g type three-screw pump shaft and bearing is small, should be driven by a prime mover directly by the elastic coupling, shall not be used pulley will produce additional radial force large transmission way. 輸送各種(zhong)油類時應注意事(shì)項:When conveying various oil matters should be paid attention to: 1、輸送40~150mm2/s的油類最(zui)合适,允許按泵的(de)最高工作壓力使(shi)用。2、輸送40mm2/s以下的油(you)類,為保證泵的流(liu)量及壽命應降壓(ya)使用。3、輸送150mm2/s以上的(de)油類,且進油管道(dào)過長,彎頭過多,泵(bèng)工作時如㊙️産生🐪噪(zào)音🆚或振動現象,則(ze)應考慮更換低一(yi)級轉速的電機運(yun)轉或縮短吸入管(guan)道,減少彎頭。1, delivery was 40 ~ 150 / s best oils, permitted to use according to the maximum working pressure of pump.2, transmission oil, under 40 was/s in order to ensure the pump flow and life should be used antihypertensive.3, transmission of more than 150 was/s oils, and the oil inlet pipe is too long, too much bend, such as noise or vibration phenomenon when the pump work, should consider to replace the low level of rotational speed of motor operation or shorten the suction pipe, reducing elbow. 、安裝前應檢查泵(bèng)的油封是否良好(hǎo),并檢查泵在運輸(shū)中是否損壞,可用(yong)手轉動聯軸器是(shi)否有卡勁現象,如(rú)有則應拆泵進🚶♀️行(hang)清洗,修理和校正(zhèng)。2、安裝泵的進油和(hé)排油管道時,其管(guan)徑不得小于泵的(de)進👅油和出油口口(kǒu)徑,進油管道不得(de)過長,彎頭不得過(guo)多,否則将影響✂️泵(beng)的工作狀态。3、當有(you)兩台以上的泵安(an)裝在同一條主管(guǎn)線上,為便㊙️于🌍泵的(de)啟🔆動,在近泵的排(pái)油管上必須安裝(zhuāng)逆止閥。4、對于在較(jiao)高溫度(指℃以上)下(xia)輸送粘度大的油(yóu)類(如:重油)的備用(yong)泵,必須👌是熱備用(yong)✂️泵,否則泵在低溫(wen)下啟動會造成電(dian)機過載或泵損❄️壞(huài)。(建❤️議在🥰靠近泵的(de)排油管上的逆止(zhǐ)閥旁,并聯安裝一(yī)🤞個小回流閥,對備(bei)用泵可微啟回流(liu)♻️閥,使泵緩慢逆轉(zhuǎn),其逆轉速≤100轉/分,使(shǐ)部分熱油經常流(liu)過泵内,達到泵熱(rè)備用目的👅)。5、輸送介(jie)質内含有機械雜(za)質。将嚴重影響泵(bèng)的運轉和降低使(shǐ)🔱用壽命,因此在泵(bèng)安裝前,必須仔細(xì)清除✨進油管内☁️的(de)焊渣,沙粒等🈲雜質(zhì),并應在進油管道(dào)靠近泵處🍓安裝濾(lü)器,濾器網孔大小(xiǎo),可根據工作情況(kuang)及介質粘度确定(dìng)。(一般可用40~80目網),過(guo)濾面積一般不得(dé)小于進油管橫截(jié)面積的20倍。、盡量在(zài)泵進油和排油口(kou)處的螺紋孔上連(lian)接壓力💜表和真🍓空(kong)🙇♀️表,以便于觀察泵(beng)的運轉狀态。7、原動(dòng)機與泵的轉軸必(bi)須在同一中心線(xiàn)上,可用直❤️尺測隙(xi)🔞規在😘聯軸器圓周(zhou)上間隔90°處檢查。8、原(yuán)動機與泵的轉向(xiang)必須一緻,嚴格禁(jin)止原動機驅動泵(bèng)逆轉💚。電機接線時(shí),應先脫開電機與(yu)泵的聯軸🤩器,對🚩電(dian)機作試⭐運轉。使其(qi)轉向與泵的轉向(xiang)标志一緻。1, before installation should check whether the oil seal of the pump is good, and check the pump is damaged in transportation, turn the coupling usable hand card trouble phenomenon, if there is any should tear open pump for cleaning, repair and calibration.2, installation of pump suction and discharge of oil pipe, the pipe diameter shall not be less than the oil inlet of the pump and the oil outlet diameter, inlet pipe shall not be too long, elbow shall not too much, otherwise will affect the pump working condition.3, when more than two head of pump installed in the same line, to facilitate pump start-up, in close to the oil drain pump must be installed on a non-return valve.4, for under high temperature (above 60 ℃) conveying the viscosity of oil (such as: heavy oil) of the standby pump, it must be hot standby pump, otherwise the pump at low temperature can cause the damage of motor overload or pump.(suggest near the exhaust non-return valve on the tubing pump, a small return valve installed in parallel, differentiable and the backflow preventer to standby pump, the pump slow reversal, the reverse speed 100 r/min or less, often make some hot oil flows through the pump, to pump hot standby purposes).5, mechanical impurity is contained within the transmission medium.Will seriously affect the operation and reduce the service life of pump, so before the pump installation, must be carefully clean up the feed tube welding slag, impurities such as grains of sand, and shall be installed in the inlet pipe near the pump filter, filter mesh size, is decided according to the working condition and medium viscosity.Available (40 ~ 80 mesh net), filter area generally shall not be less than 20 times into the cross-sectional area of the tubing.6, as far as possible in the pump suction and discharge of oil on the threaded hole mouth connect pressure gauge and vacuum gauge, in order to observe the pump running state.7, prime mover and the pump shaft must be in the same center line, available ruler feeler gauge in the coupling of the circumference of a circle by 90 ° in check.8, steering engine and pump must be consistent, strictly prohibited prime motor driven pump reversal.Electrical wiring, should first release coupling of motor and pump, a test run on the motor.The steering pump and steering sign agreement. 3G型三螺(luo)杆泵的使用1、泵啟(qǐ)動前,必須全開進(jìn)油和排油閘閥。2、首(shǒu)次啟動泵或再次(cì)使用長期封存的(de)泵時,泵内無‼️介質(zhi)✨,應在泵的進油腔(qiāng)灌注适量輸送介(jiè)質,避免泵幹啟動(dòng)。3、泵啟動後,應密切(qie)注意電流表,壓力(li)表和真空表的數(shu)值,超出規定值時(shi),應停泵找出原因(yīn)後,再行啟動。4、軸封(feng)處點滴洩露,應屬(shu)正常現象,當洩露(lu)量大量增加時,對(duì)軟填料密封應壓(yā)緊填料壓蓋,對機(jī)械密封應停泵修(xiū)複後,再行啟動。5、用(yòng)高溫蒸汽清掃管(guǎn)線時,應避免高溫(wen)蒸汽通過泵👄内。6、如(ru)果泵長期不工作(zuo)時,應進行油封,并(bìng)定期檢查油💚封情(qing)況,必要時重新油(yóu)封。The use of 3 g type three-screw pump 1, before starting the pump, oil inlet must be fully open and oil discharge gate valve.2, start the pump for the first time or again for a long time use of the pump, the pump inside without medium, should be in the inlet of the pump cavity perfusion amount transfer medium, avoid dry start pump.3, the pump starts, should pay close attention to current meter, pressure gauge and vacuum gauge value, beyond the specified value, should stop pump after find out, start again.4, shaft sealing drip leakage, should belong to the normal phenomenon, when the leak amount of increase, the soft packing seal should be compression packing gland, to pump mechanical seal shall be shutdown after repair, start again.5, with high temperature steam cleaning pipeline, should avoid high temperature steam through the pump.6, if the pump is not working for a long time, should carry on the oil seal, and regularly check oil seal, oil seal again if necessary.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
傳(chuan)真:0317-8265584 E-mail:[email protected]備案号:冀ICP05010751号-3
